Resources
Resources
Guides on COI tracking, subcontractor insurance requirements, mobilization compliance, and audit-ready vendor files for general contractors.
COI management
Builder's risk vs general liability for construction projects
Builder's risk covers the project under construction. General liability covers injury and damage to others. A GC still collects subcontractor certificates.
Updated Oct 31, 2026
Read articleCOI management
Certificate of insurance example: how to read an ACORD 25
Read a construction certificate of insurance field by field. See what an ACORD 25 summarizes, what it does not prove, and which lines fail a review.
Updated Oct 31, 2026
Read articleConstruction Compliance · New York City
Alt-1 vs Alt-2 vs Alt-3 permits in NYC
ALT1 changes use, egress, or occupancy. ALT2 covers multiple work types that do not. ALT3 is one minor work type. How NYC GCs tell them apart.
Updated Oct 31, 2026
Read articleConstruction Compliance · New York City
NYC DOB stop work order: what triggers it and how general contractors get back to work
An NYC DOB stop work order halts all or part of a job until the cited condition is corrected and the Department rescinds the order.
Updated Oct 31, 2026
Read articleConstruction Compliance
OSHA 10 vs OSHA 30: which card a commercial job site should collect
OSHA 10 and OSHA 30 are voluntary outreach cards, not a federal site license. See who typically holds each and what a GC should collect.
Updated Oct 31, 2026
Read articleConstruction Compliance
Automated Permit Tracking
A short guide to automated permit tracking for general contractors, and how Policyhold sets up a custom workflow for any permit type.
Updated Oct 20, 2026
Read articleConstruction Compliance · California
California construction waste requirements: the 65 percent rule, the waste plan, and the weight tickets
How California's 65 percent construction waste rule works, what the waste plan must name, and which weight tickets a city will count.
Updated Oct 20, 2026
Read articleConstruction Compliance · California
California demolition permit requirements
What a California city checks before a demolition permit: asbestos notice, the building permit, and the waste records that can hold final inspection.
Updated Oct 20, 2026
Read articleConstruction Compliance · New York City
Changing Electrical Contractors in NYC? What GCs Need to Update Before Work Continues
Replacing an electrical contractor in NYC? Verify the licensee, DOB NOW permit record, insurance, scope, inspections, and project handoff before relying on the change.
Updated Sep 2, 2026
Read articleConstruction Compliance
Construction Permit Tracking: A Practical Guide for General Contractors
A practical construction permit tracking guide for general contractors managing permit status, expiration dates, documents, and multiple projects.
Updated Aug 25, 2026
Read articleConstruction Compliance · New York City
NYC DOB Insurance Requirements (2026): Complete GC Guide
Struggling with NYC Department of Buildings insurance rules? Learn COI limits, PGL1 requirements, LL196 training, and how to avoid permit rejections.
Updated Oct 31, 2026
Read articleConstruction Compliance · New York City
NYC PGL-1 Form Guide (2026): How to Complete It Without Permit Delays
The NYC PGL-1 form confirms project-specific general liability coverage for DOB permits. Learn when DOB NOW requires it, who completes it, and how to avoid permit delays.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
10 Reasons Your NYC Construction Permit Is Delayed (and How to Fix Each One)
Find the record, owner, and next action behind an NYC construction permit delay using this practical DOB NOW troubleshooting guide.
Updated Oct 31, 2026
Read articleConstruction Compliance · New York City
NYC Construction Superintendent Limit in 2026: How to Keep Permits Moving
Fix an NYC permit blocked by the one-job Construction Superintendent limit, verify active assignments, and choose the correct reassignment or release path.
Updated Jul 25, 2026
Read articleConstruction Compliance · New York City
Why DOB Rejected Your Insurance Certificate in NYC
Diagnose an NYC DOB insurance failure, correct the license or PGL1 record, and resubmit the permit without repeating the same mistake.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
NYC DOB NOW Guide for General Contractors: Permits, Renewals, Inspections, and Closeout
Follow the NYC DOB NOW workflow from approved filing through PW2, permit renewal, inspection, and closeout without losing track of the next owner.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
NYC General Liability Insurance Requirements for Construction Permits Explained
Check the insurance amount, PGL1 package, policy terms, and DOB NOW steps required before an NYC construction permit can be issued.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
NYC Site Safety Training in 2026: LL196, Card Renewals, and What Workers Need to Stay on Site
Verify NYC worker and supervisor SST cards, apply the Local Law 10 renewal changes, and keep unqualified workers from delaying site access.
Updated Oct 31, 2026
Read articleOperations workflow
Top 10 vendor compliance mistakes GCs make with subcontractor COIs
Ten common GC vendor compliance mistakes: stale COIs at mobilization, email as system of record, missing endorsements, and renewal drift. Fix the workflow gaps before audit season.
Updated Jul 25, 2026
Read articleCOI management
Do I Need a COI from Contractors?
Usually yes when subs perform work on your site or your contract requires it. See when a COI is mandatory, best practice, or optional for subcontractors.
Updated Jul 2, 2026
Read articleCOI management
COI rejection email templates (itemized deficiency notices)
Copy-ready COI rejection email templates for GCs: itemized deficiency notices for missing endorsements, insufficient limits, entity mismatches, and repeat resubmission requests.
Updated Jun 16, 2026
Read articleOperations workflow
COI request email templates for general contractors
Copy-ready COI request email templates for GCs: initial onboarding, renewals, reminders, and broker-forward language with limits, endorsements, and mobilization deadlines.
Updated Jun 16, 2026
Read articleCOI management
What Happens When a Subcontractor's COI Expires Mid-Project?
When a subcontractor COI expires mid-project, work often continues while spreadsheet tracking fails. See how lapses happen, what they cost GCs, and how to prevent them.
Updated Jun 14, 2026
Read articleCOI management
What Is a Certificate of Insurance (COI) in Construction?
A certificate of insurance (COI) summarizes a subcontractor's liability coverage for GCs. Learn what ACORD 25 proves, what it does not, and how COIs fit mobilization workflows.
Updated Oct 31, 2026
Read articleOperations workflow
How to reduce vendor compliance email chaos
Reduce vendor compliance email chaos for GCs: standard COI request workflows, tracked renewals, upload portals, and mobilization checklists that replace inbox searches.
Updated Jun 2, 2026
Read articleCompliance requirements
What is an additional insured endorsement? (GC guide)
GC guide to additional insured endorsements: what they are, how they differ from COI checkboxes, and what reviewers should verify before clearing a subcontractor.
Updated Jun 2, 2026
Read articleVendor compliance
Vendor Compliance Software for General Contractors: Buyer's Guide
Vendor compliance software buyer's guide for GCs: what to track, how to evaluate platforms, and when manual compliance stops scaling.
Updated Jul 30, 2026
Read articleCOI management
COI renewal monitoring: how to stop expired certificates
Stop expired subcontractor COIs from reaching the job site: renewal monitoring cadence, alert workflows, and mobilization blocks when coverage lapses mid-project.
Updated Jun 2, 2026
Read articleAudit readiness
Building audit-ready vendor compliance files
How GCs build audit-ready vendor compliance files: retention checklist, organized COIs and endorsements, decision history, and handoff steps for owner and insurer reviews.
Updated Jun 2, 2026
Read articleMobilization
Mobilization compliance checklist for construction sites
A mobilization compliance checklist for GCs: verify COIs, licenses, and safety docs before subcontractors access the site, with clearance status visible to field teams.
Updated Jun 2, 2026
Read articleCompliance requirements
Subcontractor insurance requirements: what GCs should verify
A practical checklist for general contractors verifying subcontractor insurance: COI fields, endorsements, additional insured language, and mobilization-ready documentation.
Updated Oct 31, 2026
Read articleCOI management
COI tracking for general contractors
How general contractors can track certificates of insurance (COIs), catch expirations early, and keep mobilization decisions tied to verified coverage, not inbox searches.
Updated Jun 2, 2026
Read article