A certificate of insurance example, for a general contractor, is a reading order for the ACORD 25 Certificate of Liability Insurance. Read the named insured, the insurers, each policy's dates and limits, the description of operations, and the certificate holder. The form is a summary of what the producer says is in force on the date of the certificate. It is not the policy, and wording typed on it does not create additional insured status. Use this page beside what a COI is. This page is the line-by-line pass. It does not reproduce the copyrighted form.

How should a GC read the certificate?

ACORD 25: The certificate of liability insurance publishers use to summarize a commercial insured's general liability, automobile, umbrella or excess, and workers compensation policies on one page.

New York's Department of Financial Services lists approved ACORD 25 editions for use as certificates of insurance. The edition in your PDF can change. The blocks below are the ones GCs review on current certificates. Match the labels on the PDF you were sent. Do not review from memory of an older sample.

Read in this order. Each step answers one question. If the answer is no, stop and send the certificate back before you debate limits.

  1. Who prepared it, and how do you reach them? The producer block is the agency or broker. You need a name and a phone number or email when a limit or a date is wrong.
  2. Who is the insured? The named insured must be the legal entity that signed the subcontract, including a DBA only when that DBA is actually how that entity contracts.
  3. Which insurers are on the certificate? Insurers are lettered. Every coverage line should point at one of those letters so you know which carrier stands behind that policy number.
  4. Which policies are listed, with what dates and limits? General liability, automobile, umbrella or excess, and workers compensation are the usual construction lines. A blank line is a missing line until the contract says that line is not required.
  5. What job is this certificate for? The description of operations should identify the project, location, or contract. It is not a place to invent coverage.
  6. Who was the certificate issued to? The certificate holder should be the party your exhibit names, written as that party writes its legal name.

Then compare the page to the insurance exhibit. The requirements guide lists the endorsements and limit checks that sit behind this summary.

What does each block tell you?

Producer. This is the agency that issued the certificate. Confirm you can contact that office. A certificate with no producer phone number slows every correction.

Named insured. This is the party the policies are issued to. Compare it to the subcontract, the W-9, and the vendor record. A parent company, a former LLC, or a trade name that is not on the contract is a mismatch. Do not "read through" to the company you meant to hire.

Insurers. Each insurer is given a letter. The coverage rows use that letter in the insurer column. If general liability is marked with a letter that does not appear in the insurer list, the certificate is incomplete.

General liability. Note occurrence or claims-made, the policy number, the effective date, and the expiration date. Read each occurrence, the general aggregate, and the products-completed operations aggregate against the exhibit. The additional-insured and waiver-of-subrogation boxes are yes/no signals. A yes means you still ask for the endorsement. A yes does not attach the endorsement.

Automobile liability. Note which auto symbols are marked, such as any auto, hired autos, or non-owned autos, and read the combined single limit or the split bodily-injury and property-damage limits. If the sub will drive onto the site or haul materials, a blank auto row is a failed review unless the exhibit waives auto.

Umbrella or excess. Note whether the row is umbrella or excess, the occurrence limit, and the dates. The row should be consistent with the underlying policies it sits over. A large umbrella number with no underlying general liability row is not a complete picture.

Workers compensation. Look for workers compensation and employers liability, and for the states listed. A construction certificate that omits workers compensation is not cleared by a strong general liability limit. If the sub claims an exemption, the file needs the exemption document your program accepts, not an empty row.

Description of operations. Use this block to confirm the project name, address, and job number. Producers also type additional-insured and waiver sentences here. Treat those sentences as a request list. ACORD publishes the certificate as information about coverage. Words added in the description do not change the policy. If the sentence names a different project, the certificate was issued for the wrong job.

Certificate holder. This is the party the certificate was sent to. It is often the general contractor or the owner. It does not, by itself, make that party an additional insured. If the holder is the broker, the subcontractor, or a different GC, ask for a reissue.

Which lines fail a review?

Use this table as the fail list. Your exhibit may add rows. It should not delete the entity, date, and endorsement checks.

What you seeWhy it failsWhat you ask for
Named insured is a different LLC, a parent, or a DBA that did not sign the subcontractThe policies may not insure the party doing the workA certificate in the contracting entity's name, or written proof that this entity is the named insured
Effective or expiration dates do not cover the mobilization windowThe summary does not show coverage on the day work startsA current certificate, and a renewal process before the expiration date
Certificate holder is blank, is the broker, or names another contractorThe certificate was not issued to the party in the exhibitA reissued certificate with the correct holder name and address
Additional-insured box is checked, and no endorsement is attachedThe box does not add the GC to the policyThe additional-insured endorsement the exhibit names
Waiver box is checked, and no endorsement is attachedSame problem for waiver of subrogationThe waiver endorsement, or the policy page that grants it
Workers compensation row is emptyThe certificate does not show statutory coverage or an exemptionThe workers compensation evidence your program requires
Description names a different project or no projectYou cannot tie the summary to this jobA certificate that identifies this contract, location, or job number
Claims-made general liability when the exhibit expects an occurrence formThe trigger may not match the contractThe occurrence form, or a written exception from the person allowed to grant one
Limits below the exhibitThe summary already misses the contract numberHigher limits, or an umbrella that the exhibit allows you to count, shown on the certificate

Do not invent a limit for this table. The number is in the prime contract, the subcontract exhibit, or the owner's program. The certificate either meets that number or it does not.

A stale certificate is its own failure even when every limit looks familiar. If the issue date is old and the policy expiration is inside the project, put the renewal on the mobilization calendar. The summary is only as current as the date it was produced.

What should you request after the certificate?

Pass the certificate, then collect the documents the exhibit names. For most commercial GC programs that means the additional-insured endorsement, the waiver of subrogation when the contract requires it, and any primary and noncontributory wording the exhibit calls for. The additional insured guide explains why the endorsement, not the checkbox, is the record.

Keep the certificate and the endorsements in the vendor file for that project. When the policy renews, repeat the reading order. Do not assume the new certificate kept the same named insured and the same additional insureds.

Free tool

Check a certificate against common approval failures

Flag named-insured, date, limit, and endorsement gaps and keep the result with the vendor file.

Open the COI approval checker

When you want the short definition of the document itself, go back to what a certificate of insurance is. When you want the requirement set this reading order serves, use the subcontractor insurance requirements guide.

Sources

Reference starting points for GC compliance teams. Verify requirements with counsel and your owner contract.

Frequently asked questions

Quick answers to common questions from GC compliance teams.

General contractors use a certificate, usually ACORD 25, as a one-page summary of a subcontractor's liability policies. The example to follow is a reading order: who is insured, which policies are listed, the dates and limits, and who the certificate was issued to. The form does not replace the policy or the endorsements.