If you are preparing an NYC construction permit, the Department of Buildings will check insurance before issuance. An expired license record, missing PGL1 package, or mismatched certificate can trigger QA failure, stop-work exposure, and mechanic's lien risk on the project. This checklist covers the insurance records DOB actually reviews: license-level general liability, project-specific coverage, workers' compensation, disability, and the endorsements that support them. Use our free COI Approval Checker at the end of this guide to preflight subcontractor certificates before they reach your permit package.
Minimum general liability limits for NYC DOB permits
NYC DOB insurance requirements split into two layers. Mixing them up is one of the most common reasons permits stall.
License-level insurance belongs to the contractor or licensee record. Under 1 RCNY 104-02, a registered general contractor must maintain commercial general liability insurance with at least a $1 million combined single limit per occurrence. Required workers' compensation and disability records are handled separately on the license update.
Project-specific general liability insurance applies to covered work under 1 RCNY 101-08. The aggregate must be at least equal to the required per-occurrence limit and apply exclusively to the project. The amount depends on permitted scope and the conditions entered in the job filing.
Use DOB's Project-Specific General Liability Insurance Tool before asking a broker to issue documents. When Table 1 requires more than your primary policy carries, brokers often structure umbrella or excess layers so the total meets the generated minimum.
| Permitted work | Project-specific amount under Table 1 |
|---|---|
| Tower crane | $80 million |
| Raising or moving a building under an Alteration Type 1 or 2 permit | $2 million |
| Foundation or earthwork | $5 million, $10 million, or $15 million based on the tallest adjacent building |
| Full demolition | $5 million, $15 million, or $25 million based on the tallest adjacent building |
| New building or major alteration | $5 million, $15 million, or $25 million based on proposed and adjacent building conditions |
| Sidewalk shed or scaffold | $1 million |
| Permit not assigned an amount in Table 1 | No Table 1 project-specific amount, but applicable license-level coverage still applies |
Do not choose a limit from this summary alone. Height, stories, adjacent buildings, excavation, lot-line conditions, crane use, and scope answers can change the result. For the full limits workflow and one- or two-family exceptions, see NYC general liability insurance requirements for construction permits.
The PGL1 form (the most common trip-up)
PGL1: The Project-Specific General Liability Insurance Summary and Affirmation. DOB NOW generates it when a PW2 filing triggers project-specific coverage under 1 RCNY 101-08.
The PGL1 form is not a broker-created PDF. DOB generates it from your filing inputs and the calculated minimum amount. Your broker then issues the underlying policy and Certificate of Liability that must agree with it. An ACORD 25 summarizes coverage. It does not replace a triggered PGL1 requirement on the PW2.
| Role | Responsibility |
|---|---|
| Permit applicant | Confirms filing inputs, signs and notarizes the PGL1, coordinates the broker |
| Designated contractor | Uploads the completed PGL1 package and Certificate of Liability to PW2 |
| Insurance broker | Issues compliant project-specific coverage, signs the PGL1, provides the COI |
For the step-by-step completion workflow, signatures, and waiver rules, use the NYC PGL-1 form guide.
Additional insured and primary/non-contributory endorsements
For covered project-specific work, the policy package must do more than display the right limit. Under 1 RCNY 101-08, the City of New York, its officials, and employees must be included as additional insureds. Coverage must be at least as broad as ISO CG 00 01, and prohibited exclusions listed in the rule cannot apply to the permitted work.
On license-level general liability updates, NYC Department of Buildings must appear as certificate holder on the ACORD 25. That is different from additional-insured status on the underlying policy, but both records must be correct before DOB accepts the filing.
When contracts or owner requirements also demand additional insured language, brokers typically attach ISO forms such as CG 20 10 (ongoing operations) and CG 20 37 (completed operations), or carrier equivalents. Primary and non-contributory language must appear on the endorsement or policy form, not only in the certificate description box.
Read what is an additional insured endorsement before accepting checkbox statements without the underlying endorsement PDF.
Workers' comp and disability (the must-have for DOB)
DOB checks workers' compensation and disability insurance before it will issue or renew an applicable permit. The contractor's license insurance record must show current dates for all three coverage types: general liability, workers' compensation, and disability.
DOB's License Insurance Updates guide requires separate uploads for each type. Workers' compensation and disability cannot be submitted only on the general liability ACORD 25.
| Record type | What DOB expects | Common proof |
|---|---|---|
| Workers' compensation | Active coverage for the licensee and covered employees | Board-issued form such as CE-200 or equivalent |
| Disability benefits | Statutory disability coverage where required | Separate certificate or policy evidence |
| General liability | At least $1 million per occurrence on the license record | ACORD 25 with DOB as certificate holder |
If DOB NOW still shows expired insurance after a broker renewal, the problem is often an incomplete license update: missing WC or disability uploads, or an update that was saved but never submitted. See Why DOB Rejected Your Insurance Certificate in NYC for the correction sequence.
Site Safety Training (LL196) — it is not just insurance
Insurance compliance and worker credentials answer different DOB questions. Even with a complete permit insurance package, covered sites still need active Site Safety Training (SST) cards under Local Law 196.
At sites that require a Construction Superintendent, Site Safety Coordinator, or Site Safety Manager, covered construction and demolition workers need a valid 40-hour SST card. Designated site-safety professionals and competent persons need a 62-hour Supervisor card. OSHA 10 or OSHA 30 alone is not the SST credential.
A permit can issue while a worker's SST card is expired. That worker still cannot perform covered work on site. Treat insurance and SST as parallel mobilization controls. Use the NYC Site Safety Training guide for LL196, Local Law 10 renewal rules, and supervisor requirements.
Top 5 reasons the DOB rejects your insurance certificate
These are the defects compliance teams see most often before PW2 QA or during license insurance review. Each maps to a specific correction — not a generic "call the broker" loop.
| Rejection reason | What went wrong | Fastest fix |
|---|---|---|
| Expired policy | License GL, WC, disability, or permit dates lapsed | Complete and submit the license insurance update, then reopen PW2 |
| Wrong certificate holder | ACORD 25 does not list NYC Department of Buildings as certificate holder | Reissue certificate with correct holder before resubmitting |
| Missing waiver of subrogation | Project policy or endorsement lacks required waiver language | Obtain endorsement PDF; do not rely on certificate checkboxes alone |
| Aggregate limits too low | Project aggregate below Table 1 amount or not project-exclusive | Recalculate with DOB tool; reissue coverage and generate new PGL1 |
| Retroactive date issues (claims-made) | Claims-made policy retro date after project start or permit period | Broker must align retro date or switch occurrence form before filing |
Pending on a DOB NOW upload means the file was received. It does not mean DOB accepted it. Read the Failure Reason and required-document list before uploading the same PDF again.
For the full failure-layer workflow — license record vs PGL1 vs PW2 QA — use Why DOB Rejected Your Insurance Certificate in NYC.
Pre-submission checklist and COI checker
Run this checklist before the designated contractor submits the PW2 or before you mobilize subcontractors:
- The correct contractor business is selected on the license and PW2 records.
- License general liability, workers' compensation, and disability dates cover the expected permit term.
- NYC Department of Buildings appears as certificate holder on the license GL certificate.
- Filing inputs match the official calculator result for project-specific work.
- PGL1 and Certificate of Liability agree on limits, names, dates, and project scope.
- Applicant and broker signatures are complete; the applicant signature is notarized.
- The City of New York is included as additional insured on project-specific coverage.
- Underlying endorsements (CG 20 10, CG 20 37, waiver of subrogation) are attached when required.
- Every required document is uploaded to the correct DOB NOW slot.
- Covered workers hold active SST cards before starting work.
Free tool
Upload your COI to our free checker
See if a subcontractor certificate passes common GC review standards in about 60 seconds. Confirm NYC permit requirements separately in DOB NOW and with your insurance advisor.
Try the COI Approval CheckerSources
Reference starting points for GC compliance teams. Verify requirements with counsel and your owner contract.
- NYC DOB: 1 RCNY 101-08, Project-Specific General Liability Insurance
Project-specific limits, policy conditions, PGL1 requirements, and reporting duties.
- NYC DOB: 1 RCNY 104-02, Required Insurance
License-level insurance requirements for general contractors and other licensees.
- NYC DOB: General Liability Insurance
DOB overview and access to the project-specific insurance calculator.
- NYC DOB: Insurance Frequently Asked Questions
DOB answers on insurance updates, records, contractor businesses, and permit effects.
- NYC DOB: License Insurance Updates, March 2026
Official DOB NOW steps for selecting a business, uploading insurance, and submitting an update.
- NYC DOB: Work Permit (PW2) Step-by-Step Guide
Official DOB NOW permit request, document, attestation, and resubmission workflow.
Frequently asked questions
Quick answers to common questions from GC compliance teams.
Related resources
Construction Compliance · New York City
Why DOB Rejected Your Insurance Certificate in NYC
Diagnose an NYC DOB insurance failure, correct the license or PGL1 record, and resubmit the permit without repeating the same mistake.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
NYC General Liability Insurance Requirements for Construction Permits Explained
Check the insurance amount, PGL1 package, policy terms, and DOB NOW steps required before an NYC construction permit can be issued.
Updated Aug 10, 2026
Read article