Construction Compliance · New York City
NYC PGL-1 Form Guide (2026): How to Complete It Without Permit Delays
- PGL-1
- PGL1
- NYC PGL1
- DOB PGL1
- DOB NOW permits
- NYC construction insurance
- project specific general liability
- project-specific general liability insurance
- NYC DOB insurance requirements
Policyhold Team, Compliance operations. Practical guidance for GC compliance and mobilization operations.
The NYC PGL-1 form (also called PGL1 in DOB NOW) is a required insurance document for certain construction permits that need project-specific general liability coverage. It confirms that the project's insurance policy matches the permit filing before DOB can issue or renew the permit. For the full DOB insurance checklist — license records, workers' compensation, and endorsements — start with NYC DOB Insurance Requirements.
When your filing triggers that requirement, DOB NOW generates the form from your PW2 answers under 1 RCNY 101-08. You upload the completed PGL1 form and a matching Certificate of Liability to the required-documents area on the PW2. An ACORD 25 summarizes a policy. It does not replace the signed, notarized PGL-1 affirmation.
Who needs to complete a PGL-1?
Several parties touch the NYC PGL1 form, but each has a distinct job. Knowing who owns each step prevents the back-and-forth that stalls PW2 review.
| Role | Responsibility |
|---|---|
| General contractor / permit applicant | Confirms filing inputs, signs and notarizes the PGL-1, coordinates the broker |
| Permit holder / designated contractor | Uploads the completed PGL1 package and Certificate of Liability to PW2 |
| Filing representative (AOR, expeditor) | Verifies the DOB PGL1 amount matches the calculator output and filing scope |
| Insurance broker | Issues compliant project-specific coverage, signs the PGL-1, provides the Certificate of Liability |
The NYC DOB NOW guide for general contractors explains who completes and submits the permit request when roles overlap.
PGL-1 completion workflow
Follow this sequence from filing to permit issuance. If any step fails QA, see the insurance rejection guide.
| Step | Action | Typical owner |
|---|---|---|
| 1 | Enter DOB NOW filing inputs that drive the insurance amount | Filing representative |
| 2 | Run the official insurance calculator | Compliance manager or broker |
| 3 | Generate the PGL-1 form in DOB NOW | Permit applicant |
| 4 | Applicant signs and notarizes the PGL1 form | Permit applicant |
| 5 | Authorized broker signs the PGL-1 | Insurance broker |
| 6 | Upload PGL1 package and Certificate of Liability to PW2 | Designated contractor |
| 7 | DOB reviews required documents | DOB permit QA |
| 8 | Permit issued or renewed | DOB |
What is the PGL-1 form?
PGL-1 (PGL1): The Project-Specific General Liability Insurance Summary and Affirmation. It is a DOB-generated form that confirms the project-specific coverage, limit, and policy details match the permit filing.
The PGL form is not a broker-created PDF. DOB NOW generates the PGL1 form from your filing inputs and the calculated minimum amount. Your broker then issues the underlying policy and Certificate of Liability that must agree with it.
| Document | What it does | Who creates it |
|---|---|---|
| PGL-1 / PGL1 form | Signed DOB affirmation that project-specific coverage matches the filing | DOB NOW (generated) |
| Certificate of Liability | Evidence of the project-specific policy terms and limits | Insurance broker |
| ACORD 25 | Industry-standard summary of liability coverage on a policy | Insurance broker |
An ACORD 25 can support license-level insurance updates. It does not replace a triggered PGL-1 requirement on the PW2.
When does DOB NOW require a PGL-1?
DOB NOW requires a PGL1 form when the PW2 filing triggers project-specific general liability insurance under 1 RCNY 101-08. Common triggers include tower crane use, major new-building work, full demolition, and foundation or earthwork above certain adjacent-building thresholds.
The amount ranges from $1 million to $80 million depending on scope, building dimensions, adjacent buildings, and crane use. Do not guess the limit. Run DOB's calculator before asking a broker to issue documents.
For the full limits table, policy conditions, and one- or two-family exceptions, see NYC general liability insurance requirements for construction permits.
How do you complete the PGL-1 step by step?
Use this checklist when the DOB PGL1 required-document slot appears on your PW2:
- Check the job filing answers that drive the insurance amount.
- Run the official calculator and send the result to the broker.
- Obtain compliant project-specific coverage and the matching Certificate of Liability.
- Generate a fresh PGL-1 from DOB NOW.
- Print and sign the PGL1 form.
- Notarize the applicant signature and obtain the authorized broker signature.
- Upload the PGL1 package and Certificate of Liability to the PW2 required-document area.
- Check that each document moves through review.
Pendingmeans uploaded, not accepted. - Resolve any QA failure reason and resubmit through the designated contractor.
The DOB NOW PW2 step-by-step guide explains who completes and submits the permit request. NYC PGL1 is required again on an applicable permit renewal.
What must the underlying policy satisfy?
The PGL-1 form confirms coverage that already exists. The policy package must meet 1 RCNY 101-08 before anyone signs.
Use this broker checklist:
- The per-occurrence limit meets the calculated amount.
- The aggregate is at least equal to that limit and applies exclusively to the project.
- The City of New York, its officials, and employees are included as additional insureds.
- Coverage is at least as broad as ISO CG 00 01.
- The policy does not exclude the permitted work or contain a prohibited exclusion listed in 1 RCNY 101-08.
- The policy details match the work location, permit applicant, and filing scope.
- The coverage dates support the requested permit period.
Prohibited exclusions include completed operations, XCU, third-party action-over, and NYC work exclusions. Residential or exterior insulation and finish system exclusions also matter when that work is involved.
What mistakes cause PGL-1 QA failures?
These are the most common reasons a PGL1 package fails PW2 review:
- The PGL-1 form is missing or uploaded to the wrong slot.
- The Certificate of Liability is missing or does not match the PGL1 amount.
- The applicant did not sign or notarize the PGL-1.
- The authorized broker did not sign.
- The stated limit does not match the amount generated from the job conditions.
- Policy or certificate details do not agree with the project, permit applicant, or work scope.
- A revised filing reset an attestation that was not completed again.
For the full correction workflow, see Why DOB Rejected Your Insurance Certificate in NYC. If insurance is only one open issue on the permit, use the NYC permit delay guide.
Example: reusing a prior project's PGL1 package
A GC sends the broker a $5 million package from a prior job. The current filing has a taller adjacent building, so DOB NOW generates a $15 million minimum. Uploading the old PGL1 form and certificate does not solve the requirement, even if the address and policy dates look correct.
Recheck the filing inputs, confirm the official calculation, have the broker assemble compliant coverage, and generate a new PGL-1 that matches it.
Can you waive or defer a PGL-1 requirement?
If DOB NOW triggered a PGL1 requirement for work that does not require project-specific insurance, recheck the filing inputs first. Filing answers, not the broker, usually drive the trigger.
If the DOB PGL1 requirement is genuinely inapplicable, request a waiver through the document Action menu and explain why the trigger is incorrect. PGL1 is waiver-eligible but not deferrable under DOB's March 2026 waiver and deferral list. A waiver request corrects an inapplicable document trigger. It does not waive insurance required by law.
What happens after the PGL-1 is approved?
An accepted PGL1 package clears the project-specific insurance document requirement so DOB can issue or renew the permit. That is a permit milestone, not the end of insurance compliance on the job.
Once work begins, the operational challenge shifts. The GC must collect subcontractor COIs, verify endorsements, and track renewals through mobilization. The PGL-1 form got the permit approved. Ongoing subcontractor insurance compliance is the next problem.
| Record | Operational question | Primary reviewer |
|---|---|---|
| PGL1 and project-specific coverage | Does the permitted work carry the required project-specific protection? | DOB permit QA |
| Subcontractor COI and endorsements | Does this subcontractor meet the contract requirements for this job? | GC compliance or risk team |
| Renewal evidence | Will coverage remain current through active work? | GC and DOB, depending on the record |
Use subcontractor insurance requirements to build the project review checklist. If additional-insured language is causing confusion after mobilization, read the GC guide to additional insured endorsements. You can also use the subcontractor insurance requirements generator to draft a practical spec once permit-level coverage is confirmed.
Once subs start mobilizing, use the COI Approval Checker to flag common certificate gaps before they block work.
Free tool
Review subcontractor certificates before mobilization
Flag common COI gaps (missing endorsements, wrong limits, expired dates) after the PGL-1 clears your permit and subs begin work.
Open COI Approval CheckerSources
Reference starting points for GC compliance teams. Verify requirements with counsel and your owner contract.
- NYC DOB: General Liability Insurance
DOB overview, PGL1 form instructions, and access to the project-specific insurance calculator.
- NYC DOB: 1 RCNY 101-08, Required Insurance and Indemnification
Project-specific limits, policy conditions, exceptions, PGL1 requirements, and reporting duties.
- NYC DOB: Insurance Frequently Asked Questions
DOB answers on project-specific liability, PGL1 submission, and umbrella policies.
- NYC DOB: Work Permit (PW2) Step-by-Step Guide
Official DOB NOW permit request, document upload, attestation, and resubmission workflow.
- NYC DOB: Waiver and Deferral Document Request List
Lists PGL1 as waiver-eligible and not deferrable under current DOB NOW rules.
- ACORD: Certificates of Insurance FAQ
Explains the purpose and limits of a certificate of insurance.
Frequently asked questions
Quick answers to common questions from GC compliance teams.
Related resources
Construction Compliance · New York City
NYC General Liability Insurance Requirements for Construction Permits Explained
Check the insurance amount, PGL1 package, policy terms, and DOB NOW steps required before an NYC construction permit can be issued.
Updated Aug 10, 2026
Read articleConstruction Compliance · New York City
Why DOB Rejected Your Insurance Certificate in NYC
Diagnose an NYC DOB insurance failure, correct the license or PGL1 record, and resubmit the permit without repeating the same mistake.
Updated Aug 10, 2026
Read article