ABOUT POLICYHOLD

The system of record for vendor compliance on active job sites.

General contractors need one place they trust for subcontractor compliance, not a folder of PDFs, not a spreadsheet someone updates when they have time, and not the last person who touched the vendor packet.

Policyhold is vendor compliance software built for that role: the operational system of record where subcontractor compliance tracking, certificate of insurance tracking, and mobilization decisions connect. When your team asks who is cleared for site, the answer should not depend on memory or email.

WHY WE BUILT THIS

Compliance failures do not announce themselves. We built Policyhold because teams deserve a source of truth.

We have worked alongside general contractors long enough to see the same pattern repeat. Vendor compliance starts as a manageable process: packets in email, a shared drive, a coordinator who knows the vendors. Then the project count grows. Mobilizations stack up. Staff turns over. The spreadsheet that looked current wasn’t. An expired COI surfaces after work has started. An audit request sends three people searching inboxes for documents that should take minutes to produce.

The process that works with twenty vendors often breaks at two hundred. What holds together for one project rarely survives ten active job sites. Teams do not always buy software because of today’s problems. They buy because tomorrow’s project volume will break today’s process.

Existing approaches fail for predictable reasons. Spreadsheets record status; they do not enforce it. Email chains hold decisions; they do not preserve them as a durable record. Manual coordination works until the coordinator is out, leaves, or is simply underwater. Then renewals stop, coverage lapses, and operations keeps moving.

We did not build Policyhold to digitize a filing cabinet. We built it because construction teams need contractor compliance software that operationalizes compliance: continuously monitored, tied to mobilization, and defensible when liability questions come.

Policyhold is the system of record your operations, compliance, and risk teams can rely on, not a dashboard someone glances at once a week.

WHAT WE OBSERVED

The tools teams use were never designed for how compliance actually runs.

The homepage describes the operational failures in detail. On an About page, the point is simpler: fragmented processes create risk every day work is on site, not only on review day.

Vendor truth scatters.

COIs, endorsements, and approvals live across inboxes, shared drives, and one coordinator’s memory. There is no authoritative record. Only the last person who touched the file.

Passive tracking creates false confidence.

A folder of PDFs or a legacy COI tracker tells you what you had last time someone looked. It does not tell you who is cleared for site right now.

Manual coordination does not scale.

Renewals on a calendar. Escalations in reply-alls. Audit answers built under pressure. Insurance compliance management by heroic effort is not a process. It is a person holding the operation together.

These are not edge cases. They are why teams outgrow spreadsheets long before they outgrow the exposure. See how Policyhold compares to traditional compliance processes

HOW WE THINK ABOUT COMPLIANCE

Compliance is operational readiness, not document storage.

Compliance is not document storage.

Storing certificates is table stakes. Knowing whether a vendor meets your requirements for a specific project and acting on gaps is the work.

Compliance is not spreadsheet maintenance.

A tab everyone is afraid to edit does not enforce limits, catch expirations, or block mobilization when coverage lapses.

Compliance is operational readiness.

The question that matters is not “do we have the COI on file?” It is “can this subcontractor go on site today without exposing the project?”

Compliance should be continuously enforced, not periodically reviewed.

Status that updates only when someone has time to check a spreadsheet is status you cannot trust at mobilization.

Policyhold applies these principles as construction compliance software with a compliance engine behind it, not manual flags, not passive archives. That is what makes it a system of record, not a filing system.

WHAT POLICYHOLD DOES

One system of record from vendor packet to site clearance.

Policyhold runs the loop your compliance coordinators perform manually today: intake, review, renewal, escalation, and record-keeping, so the system keeps working when the inbox gets busy.

  • Centralize and enforce. COIs, endorsements, and trade requirements in one place, with rules by project and vendor tier.

    Explore trade-specific requirements with our free generator →
  • Monitor continuously. Expirations and coverage gaps surface before mobilization, not after a superintendent asks.

  • Onboard with accountability. Vendor portal and upload paths feed a review queue with context, approvals, and a record that survives staff turnover.

  • Stay audit-ready. Timestamped approvals, blocks, exceptions, and exportable history. Normal operations, not a two-week scramble.

See the product · View pricing

WHO WE SERVE

For the teams who carry vendor compliance every day.

Policyhold serves general contractors and construction operators managing subcontractor networks across active projects:

  • Compliance teams

    Coordinators and managers who run review queues, chase renewals, and need a system of record that does not depend on re-keying certificates from email.

  • Operations leaders

    Directors and executives who need mobilization readiness across projects without calling three people or opening a spreadsheet nobody trusts.

  • Project teams

    Project managers and superintendents who need to know who is cleared for site before the crew shows up.

  • Risk managers

    Staff responsible for vendor risk management, coverage visibility, and enforcement history across the vendor program.

WHY TEAMS TRUST POLICYHOLD

Built for the operational realities of construction compliance.

Focused exclusively on construction compliance

Not a generic vendor management platform adapted for GCs. Built around subcontractor insurance, mobilization, and job-site clearance.

Designed around real GC workflows

Projects, trades, mobilization cadence, and coordinator handoffs, not enterprise procurement abstractions.

Built to support audits and insurance reviews

Timestamped decisions, named approvers, and exportable records when owners, insurers, or auditors request proof.

Created for teams managing active subcontractor networks

Scales from a single project rollout to multi-site programs without depending on one person’s inbox.

WHY TEAMS SWITCH

Most teams do not replace spreadsheets because they dislike spreadsheets.

They switch when the process stops keeping up with the work.

  • Expired coverage is discovered too late, often at mobilization, not during review.
  • Audit requests become painful multi-day inbox searches.
  • Project volume increases and the coordinator cannot keep up.
  • Compliance depends on one person, and that person is out, leaves, or is underwater.
  • Nobody on site can answer who is cleared for work with confidence.

Policyhold exists for that moment: when vendor compliance needs to become a system the whole team can trust, not a process one coordinator holds together.

OUR MISSION

Make vendor compliance the system of record your team can trust.

Our mission is to give construction teams a reliable, operational system of record for subcontractor compliance, one that identifies problems early, routes action to the right people, clears vendors for site based on rules, and keeps an audit trail current while work moves.

Compliance should not depend on memory, hero coordinators, or a weekly spreadsheet review. It should run continuously so operations can focus on building. When mobilization week arrives, your team already knows who is cleared for site.

WHAT IS POLICYHOLD?

Construction compliance software for general contractors.

Policyhold is construction compliance software for general contractors. The platform helps construction companies manage subcontractor compliance tracking, certificate of insurance tracking, vendor onboarding, compliance reviews, renewal management, mobilization readiness, and audit preparation from a single system of record, so operations, compliance, and risk teams share one authoritative source for vendor clearance status across active job sites.

SEE IT IN YOUR WORKFLOW

When mobilization week arrives, your team already knows who is cleared for site.

That is the outcome Policyhold is built for. Not another place to store PDFs. Not a compliance score on a dashboard nobody checks. A system of record your coordinators, project teams, and risk staff trust before clearing a subcontractor for work, and the record you pull when an owner, insurer, or auditor asks for proof.

Walk through your trade requirements, mobilization workflow, and audit cadence, not a generic product tour.

COMMON QUESTIONS

Common questions