Construction Compliance

OSHA 10 vs OSHA 30: which card a commercial job site should collect

By Policyhold Team, Compliance operationsPublished Updated 8 min readSources & references
  • OSHA 10 vs OSHA 30
  • OSHA outreach training
  • construction safety cards
  • general contractors
Share

Policyhold Team, Compliance operations. Practical guidance for GC compliance and mobilization operations.

OSHA 10 and OSHA 30 are student course completion cards from the OSHA Outreach Training Program. The 10-hour construction class is awareness training for workers. The 30-hour construction class is the longer class OSHA points supervisors and workers with safety responsibility toward. Federal OSHA does not require either card on every construction job. General contractors collect the card when the owner, the site rule, or a state or city program requires it, and they file the construction card that matches the person. In New York City, neither card replaces a Site Safety Training credential.

What is the difference between OSHA 10 and OSHA 30?

OSHA 10: A 10-hour Outreach Training Program class that gives workers awareness of common job-related safety and health hazards, plus workers' rights, employer responsibilities, and how to file a complaint.

OSHA 30: A 30-hour Outreach Training Program class that covers a greater depth and variety of workplace-hazard topics. OSHA's FAQ says it is more appropriate for supervisors or workers with some safety responsibility.

OSHA authorizes trainers who have completed an outreach trainer course. Those trainers teach the class and request student course completion cards. The card shows that the person finished that class. OSHA's FAQ says the card is not a certification or a license.

QuestionOSHA 10OSHA 30
Who OSHA says it is forWorkers who need awareness of common hazardsSupervisors or workers with some safety responsibility
Minimum length10 hours30 hours
What it emphasizesRecognition, avoidance, abatement, and prevention of hazards, plus worker rightsGreater depth and a wider topic list on the same kind of orientation
What it is notA license, a competent-person card, or NYC SSTA license, a competent-person card, or NYC SST

The same trainer may later add hours and exchange a 10-hour card for a 30-hour card, but only under OSHA's conditions: the same trainer conducts all of the training, the span from the start of the 10-hour class to the end of the 30-hour class is within six months, and the student returns the 10-hour card. OSHA requires that return so the person is not treated as having 40 hours from holding both cards. A GC that sees both cards for courses stacked that way should expect the 10-hour card to have been surrendered. Do not add the hours together.

Does federal OSHA require either card?

No. OSHA's Outreach FAQ answers "Does OSHA require the 10- and 30-hour outreach courses?" with no. The courses are voluntary. OSHA recommends them as an orientation to occupational safety and health. The 2024 construction procedures say the same thing: outreach training does not meet the training requirements in any OSHA standard, and the federal government does not mandate participation.

States, cities, employers, unions, and owners may still require the class. OSHA says any decision about what satisfies that mandate belongs to the organization that imposed it. A GC writing a site rule should say which card, which industry (construction, not general industry), and whether a temporary completion certificate is acceptable while the plastic or electronic card is still inside the 90-day issuance window.

Outreach training is an orientation. OSHA's FAQ says workers must receive additional training on the specific hazards of their job. A card in the file does not close fall protection, silica, confined space, or equipment training that a standard or the employer's program requires.

What does the construction course cover?

OSHA publishes topic procedures for authorized trainers. The construction procedures say training should emphasize hazard identification, avoidance, control, and prevention, not a line-by-line reading of OSHA standards.

For the 10-hour construction class, instructional time is a minimum of 10 hours. The procedures require about six hours on designated topics: a one-hour introduction to OSHA, four hours on the Focus Four hazards (falls for at least one hour and 30 minutes, plus electrocution, struck-by, and caught-in or between), 30 minutes on personal protective equipment, and 30 minutes on health hazards in construction. At least two more hours come from elective topics. The class is aimed at hazards a worker may encounter on a construction site.

For the 30-hour construction class, instructional time is a minimum of 30 hours. The procedures describe it as training for workers with some safety responsibilities and require a longer block of designated topics, including the introduction to OSHA and a deeper treatment of the Focus Four, plus electives. OSHA posts the outlines for trainers. A GC does not need to re-teach the outline at the gate. The GC needs the card that shows the person completed the class the site asked for.

There is also a 10-hour and a 30-hour class for general industry, and outreach classes for maritime and disaster site workers. A general-industry card is not the construction class. If the person will perform construction work, ask for the construction card unless the requiring party has said otherwise.

What should a GC collect before mobilization?

Use the same vendor file you already keep for insurance and site access. The mobilization compliance checklist is the broader gate. For outreach cards, check these items and stop at the first miss:

  1. The card is a student course completion card from the Outreach Training Program, not a vendor's internal orientation sticker.
  2. The industry line says construction when the person is doing construction work.
  3. The hour mark matches the site rule: 10 or 30. Do not accept a 10-hour card for a role the owner specified as 30-hour.
  4. The name matches the person who will be on site. A shared PDF or a card in a different worker's name is not that person's record.
  5. You know whether this job accepts a trainer's completion certificate while the card is still being issued. OSHA says trainers must issue the card directly to the student within 90 days of class completion, and that accepting a certificate instead of the card is up to the employer or the job site.
  6. You have not treated the card as proof of competent-person status, equipment qualification, or a city credential.

OSHA does not keep these class records and will not print a replacement. A replacement card can be issued only if the class was taken within the last five years, only one replacement may be issued per student per class, and the person must contact the outreach trainer. Build that lead time into mobilization. A worker who cannot find a five-year-old card may need a new class, not a phone call to OSHA.

How is an OSHA card different from an NYC SST card?

On a New York City site that must designate a Construction Superintendent, Site Safety Coordinator, or Site Safety Manager, covered workers and supervisors need the Department of Buildings Site Safety Training credential. An OSHA 10 or OSHA 30 card can be part of a path toward that credential. It is not the credential.

RecordWho issues itWhat it proves on a NYC covered site
OSHA 10 or OSHA 30 construction cardAn OSHA-authorized outreach trainerThe person finished that voluntary outreach class
NYC SST cardThe NYC SST program under Local Law 196The person holds the city credential for the role, when the card is active and the role matches

OSHA's FAQ says construction outreach cards do not have an expiration date. New York's SST card does expire, and the city applies its own rules when it credits OSHA coursework toward a new SST card. Those city rules are easy to get wrong if you only read the federal FAQ. Use the NYC Site Safety Training guide for Local Law 196, the 2026 renewal changes, and which card a worker or supervisor needs before covered work.

Do not turn a worker away, or clear a worker, on the OSHA card alone when the site is an SST site. Check the SST record. Do not skip the OSHA card when the owner or another jurisdiction still requires it. The two files sit next to each other. They do not replace each other.

What the card does not decide

The outreach card does not decide who is the controlling employer, who pays for the class, or whether a subcontractor's safety program meets the subcontract. It does not clear insurance, and an insurance clearance does not clear the card. Keep the copies with the person and the project, note the hour level and the industry, and review them again when a new crew mobilizes.

For the rest of the gate — certificates, endorsements, and who is allowed to start — stay on the mobilization compliance checklist. For New York City credentials, stay on the SST guide. This page answers only the federal outreach comparison those other pages assume.

Sources

Reference starting points for GC compliance teams. Verify requirements with counsel and your owner contract.

Frequently asked questions

Quick answers to common questions from GC compliance teams.

OSHA's Outreach FAQ says the 10-hour class gives workers awareness of common job hazards. The 30-hour class is more appropriate for supervisors or workers with some safety responsibility and covers a greater depth and variety of topics. Both are construction, general industry, or maritime outreach classes. A construction site should collect the construction card.