COI management
Certificate holder vs additional insured on a construction COI
- certificate holder vs additional insured
- ACORD 25
- COI review
- general contractors
Policyhold Team, Compliance operations. Practical guidance for GC compliance and mobilization operations.
The certificate holder is the party the certificate was sent to. An additional insured is a party the subcontractor's policy adds, by endorsement or by a term in the policy. General contractors need both the holder block and the endorsement, and they do different jobs. A certificate issued to the GC does not put the GC on the policy. A sentence in the description of operations does not either.
What does the certificate holder block do?
Certificate holder: The person or organization named at the bottom of the certificate as the party the certificate was issued to.
That block is an address. It tells you who was supposed to receive this summary, and it gives the producer a place to send a corrected certificate. On a commercial subcontract it is usually the general contractor, the owner, or a lender the prime contract names. The exhibit should say which legal name to use. Reviewers compare the block to that name.
Accept the block when all of these are true:
- The legal name matches the party in the exhibit, including the entity suffix (Inc., LLC, LP).
- The address is a real address for that party, not the subcontractor's office and not the broker's office.
- If the exhibit requires the owner and the GC, you have a certificate for each, or one certificate that names the party this file is tracking. Do not assume the owner's copy is in your folder because the subcontractor said it was sent.
Reject and ask for a reissue when the holder is blank, is the broker, is the subcontractor, is a different general contractor, or is a shortened project name ("Riverside Job") that is not the contracting entity. People search the old PDF by project nickname later and cannot tell which company was supposed to rely on it.
The holder block is still worth getting right. It shows the certificate was prepared for this contract. It does not change coverage.
What does additional insured status do?
Additional insured: A person or organization added to the named insured's liability policy, by endorsement or by a term already in the policy, for claims the form covers.
Additional insured status can give that party a right to defense and indemnity under the subcontractor's policy, within the endorsement's limits, the policy's exclusions, and the contract conditions the form requires. It is the instrument the insurance exhibit is usually trying to put in the file when it says "GC shall be named as an additional insured."
The certificate can mention that status in two places. Neither place creates it.
- A checkbox in the general liability section.
- A typed sentence in the description of operations.
Both are the producer reporting that an endorsement exists or has been requested. The record is the endorsement PDF: the form, the edition, the schedule, and the policy number. Which form you ask for depends on the exhibit. Ongoing operations and completed operations are commonly handled on separate forms, often CG 20 10 and CG 20 37 or carrier equivalents. This page does not restate that review. Use the additional insured guide for the form check, and keep the holder check on this page.
| Question | Certificate holder | Additional insured |
|---|---|---|
| Where it appears | The holder block on the certificate | An endorsement, or a term in the policy |
| What it does | Identifies who received the summary | Adds a party to the liability policy, within the form |
| Does it amend the policy? | No. The certificate says it is information only | Yes, when the endorsement is issued |
| Does it promise defense and indemnity? | No | Only as the endorsement and policy provide |
| Does it promise cancellation notice? | No | No, unless a separate notice endorsement says so |
| What the GC files | A certificate issued to the legal name in the exhibit | The endorsement, attached to the matching policy number |
Why doesn't the holder receive cancellation notice?
Older certificates included a statement that the insurer would endeavor to mail the holder a set number of days of notice if the policy was cancelled, and that a failure to mail it imposed no duty on the insurer. The certificate in use now says notice of cancellation will be delivered in accordance with the policy provisions. ACORD's certificate is still information only. It does not create a notice right the policy does not already give.
Standard liability policies oblige the insurer to notify the first named insured. The certificate holder is not the first named insured. An additional insured is not the first named insured either. None of the usual additional insured endorsements add a duty to notify the additional insured that the policy has been cancelled.
A contract sentence that says "30 days' notice of cancellation to the certificate holder" asks for something the certificate cannot grant. The ways that sentence gets answered in practice are:
- The carrier issues a notice endorsement naming the holder and the number of days. File that endorsement. It is uncommon, and it is a carrier form rather than a standard additional insured form.
- The carrier will not issue the endorsement. The file should say so. The GC then relies on the subcontractor's duty in the subcontract to tell the GC, on renewal tracking, and on collecting a new certificate before the expiration date on the current one.
- Someone types "30 days' notice of cancellation" into the description of operations. That sentence has the same effect as any other sentence in that box. It does not amend the policy.
Build the operational control around the expiration date you can see. The date on the certificate is a monitoring date. It is not a promise that the insurer will write to you before that date. Pair the holder review with the waiver of subrogation check when the exhibit requires a waiver, because that waiver is also an endorsement, not a checkbox and not a holder-block right.
The Alliant Insurance Requirements in Contracts manual describes this limit in the same terms: if notice is required, it has to be endorsed onto the policy, and often the endorsement does not come back. Reviewers who treat a typed "30 days" as received notice will be surprised by a cancellation they learned about from a jobsite incident.
What belongs in the description of operations?
Description of operations: The certificate block where the producer identifies the project, location, or contract, and often types additional insured or waiver sentences.
Use the block to tie the certificate to this job. Look for the project name, the address, and the job or contract number your exhibit uses. A description that names a different project is a certificate for a different file. Ask for a reissue.
Use the block as a request list when it mentions additional insured status, waiver of subrogation, or primary and noncontributory wording. Those phrases tell you what the producer thinks was ordered. They do not perform the order. For each phrase, either the matching endorsement is attached or the item stays open.
Do not ask the producer to "add us as additional insured in the description." Ask for the endorsement, and ask for the holder block to carry the legal name. Those are two requests because they are two records.
What should you request before mobilization?
Run the holder and the endorsement as separate checks. Both should be done before the crew is released to the site.
- Compare the holder block to the exhibit. If the name or the address is wrong, request a reissued certificate before you spend time on limits.
- Read the description only to identify the project and to list the endorsements the producer claims to have added.
- Match policy dates to the mobilization window. A holder block on an expired policy is still an expired policy.
- Collect the additional insured endorsement the exhibit names. Confirm the policy number, the parties, and whether completed operations are included when the contract requires them.
- If the exhibit asks for notice of cancellation, ask the broker for the notice endorsement. If the carrier will not issue it, write that down and track the expiration date yourself.
- File the certificate and the endorsements together under the subcontractor and the project. The holder name on a PDF in a shared drive, with no endorsement beside it, will not answer an audit.
A correct holder block is step one of the certificate reading order. It is not the last step. When you want a structured pass over named insured, dates, limits, and missing endorsements, use the COI approval checker, then file the endorsements the checker cannot see.
This article is operational guidance for general contractor compliance teams. It is not legal or insurance advice. Confirm notice and additional insured requirements against the policy forms and the contract.
Sources
Reference starting points for GC compliance teams. Verify requirements with counsel and your owner contract.
- ACORD: Forms
Publisher of ACORD 25. The certificate is information only and does not amend the policies it summarizes. This guide does not reproduce the form.
- New York DFS: Approved ACORD 25 certificate
New York approves specified ACORD 25 editions for use as certificates of liability insurance.
- Alliant: Insurance Requirements in Contracts (2026.1)
Explains that cancellation notice follows the policy unless a notice endorsement is issued, and that the certificate cannot create that notice.
Frequently asked questions
Quick answers to common questions from GC compliance teams.
Related resources
Compliance requirements
What is an additional insured endorsement? (GC guide)
GC guide to additional insured endorsements: what they are, how they differ from COI checkboxes, and what reviewers should verify before clearing a subcontractor.
Updated Jun 2, 2026
Read articleCOI management
Certificate of insurance example: how to read an ACORD 25
Read a construction certificate of insurance field by field. See what an ACORD 25 summarizes, what it does not prove, and which lines fail a review.
Updated Oct 31, 2026
Read article